Procedia - Social and Behavioral Sciences · 2016 · 37 citations · 29 references
ManagementConstruction ManagementProject ManagementConstruction Project ManagementMulti-criteria Decision MakingProject PlanningInfrastructure ConstructionInfrastructure DevelopmentInfrastructure ManagementProject Delivery MethodsProject Delivery SystemsProject SelectionInfrastructure Delivery PlanningProject Delivery ManagementProject Delivery Method SelectionProject Outcome AssessmentPublic Infrastructure Planning
The project delivery method (PDM) greatly influences the project outcome. Design-Build, Construction Management and Design-Bid-Build represent the three main methods. Each PDM comes up with its own advantages and disadvantages which suit different projects in different circumstances. A general literature review and a case specific document study were carried out. Firstly, this paper identifies general criteria for selecting PDM. Secondly, it comes up with specific criteria for selecting the PDM for a large infrastructure project. Due to the project characteristics, the identified specific selection criteria differ from the general selection criteria. The Norwegian Public Roads Administration (NPRA) plans a coastal highway route (E39) along the western coast of Norway covering a total of 1100 km, substituting seven ferry connections, with an estimated cost of 268 billion Norwegian kroner. This project is used as an exemplary case of a large infrastructure project. The paper contributes to the body of knowledge with a list of selection criteria for PDMs aggregated from literature, and points out that this list should be adapted to case specific characteristics before being used to select a PDM
29