Rare Metals and Cemented Carbides · 2003 · 15 citations · 0 references
EngineeringChemical EngineeringMining EngineeringMineral ProcessingSoil RemediationSurface MiningLeachate ManagementLeaching ControlLeaching ManagementOre MineralogyOre ProcessingImpurity RemovalLeachingLeaching ChemistryLeaching OptimizationMetal LeachingMetal RemediationProduct Quality ControlTest Optimization
In the course of southern RE ore leaching,Al is the major impurity affecting the product quality.Study is made of Al inhibition by addition of Al inhibitor in the ore leaching reagent to reduce leached Al.The optimization test results showed that Al in the resultant leachate is reduced by 56.85% by adding 0.05% HZA inhibitor in the leaching reagent and at controlled pH value 5.5 with little influence on RE recovery.