Journal of Water Pollution Control Federation · 1984 · 25 citations · 3 references
EngineeringChemical EngineeringEnvironmental EngineeringWaste ManagementWastewater TreatmentWater TreatmentNitrogen RecoveryNitrogen RemovalNutrient RemovalOrganic Contaminant RemovalTertiary TreatmentWaste TreatmentBiological Nitrogen RemovalDenitrificationDenitrification ProcessesDirect CostsEconomic FeasibilityEconomic Feasibility AnalysisHydraulic Retention TimePhenolic Compounds
The technical and economic feasibility of treating a combined stream of coke plant waste water and blast furnace blowdown water in a coupled fluidised bed process, operated in the denitrification-denitrification flow mode, was evaluated. More than 90% removal of total nitrogen was achieved at a total system hydraulic retention time of 4.5 h. Removal of other conventional contaminants, including filtered organic carbon, phenolic compounds, thiocyanate, and cyanide consistently approached or exceeded 90%. Capital costs associated with treatment of 4950 m/SUP/3/d of combined waste water were estimated to be 2.3 million Canadian dollars. Direct operating costs were calculated to be 0.14 Canadian dollars m/SUP/3 treated effluent.
3
Process Design Manual for Nitrogen Control.
Denny Parker · 1975 · 340 citations