This paper documents the effort to perform dynamic model validation for the U.S. Eastern Interconnection (EI) by modeling the governor deadband. The Western Electricity Coordinating Council-modified 1981 IEEE type 1 turbine governor model (WSIEG1) was added to the EI model. A frequency response sensitivity study is conducted to look at the impacts of a few major factors. The significance of modeling governor dead band is evident. Simulated frequency responses are adjusted and validated against the measurements collected by the frequency monitoring network. Two actual events are replicated in a 16 000-bus EI dynamic model. This paper demonstrates the need for a comprehensive effort on governor dead band modeling by the industry.