Electric Power Components and Systems · 2016 · 14 citations · 21 references
Natural SciencesIndustrial EngineeringWater Resources ManagementOptimizationSchedulingWater Resources EngineeringInteger ProgrammingOptimization Under UncertaintyStochastic OptimizationStochastic ProgrammingStochastic SchedulingWater EconomicsBilateral Electricity ContractsDeterministic OptimizationEnergyMixed-integer ProgrammingMixed-integer Programming For SchedulingPerformance CurvesStochastic Integer ProgrammingStochastic Mixed-integer Programming
This article presents a stochastic model for self-scheduling of a purely hydro generating company participating in the day-ahead joint energy and reverse market aimed at maximizing the profit. In the proposed framework, the mixed-integer non-linear programming of the hydro self-scheduling problem is converted into mixed-integer programming. The hydro self-scheduling problem with uncertainties, such as outages of generation units and volatile market prices, is modeled as a stochastic mixed-integer programming problem. Random 24-hr scenarios are generated using Roulette wheel mechanism and lattice Monte Carlo simulation methods. Afterward, the proposed stochastic model is decomposed into deterministic optimization sub scenarios. For great accuracy, multi-performance curves are employed in the modeling stage. Moreover, wide-ranging parameters are taken that result in an absolutely real outcome, e.g., head dependent reservoirs, start-up cost, water discharge limits, initial and final volume, water balance constraints, spinning and non-spinning reserve, spillage of reservoir, and a cascade hydro plant. Finally, for a test system with eight hydro plants, the bilateral contracts are evaluated in terms of performance indices to demonstrate the effectiveness of proposed model.
21
Hadi Moghimi Ghadikolaei, Abdollah Ahmadi, Jamshid Aghaei et al. · Renewable and Sustainable Energy Reviews · 2012 · 78 citations