IEEE Transactions on Power Systems · 2002 · 325 citations · 18 references
Natural ResourcesWater Resources ManagementEnergy EconomicsRiver Basin ManagementWater Resources EngineeringHydropower EngineeringHydropower OperationsHydropower SystemsReservoir ManagementWater EconomicsWater ManagementDay-ahead Electricity MarketsDay-ahead ForecastingElectricity Market AnalysisHydro-economic ModelingHydropower EconomicsHydropower OptimizationHydropower SchedulingStart-up
The paper studies self‑scheduling of a hydro generating company with cascaded plants in a pool‑based electricity market. The objective is to maximize the company’s profit from selling energy in the day‑ahead market. A 0/1 mixed‑integer linear programming model is proposed that captures the nonlinear, nonconcave 3‑D relationship between power, water discharge, and reservoir head for each plant, and also incorporates start‑up costs due to wear and tear. The model is validated by detailed analysis of realistic case studies.
This paper addresses the self-scheduling of a hydro generating company in a pool-based electricity market. This company comprises several cascaded plants along a river basin. The objective is to maximize the profit of the company from selling energy in the day-ahead market. This paper proposes a 0/1 mixed-integer linear programming model to account, in every plant, for the nonlinear and nonconcave three-dimensional (3-D) relationship between the power produced, the water discharged, and the head of the associated reservoir. Additionally, start-up costs due mainly to the wear and tear are considered. Finally, different realistic case studies are analyzed in detail.
18