International Journal of Mining Reclamation and Environment · 2016 · 28 citations · 33 references
EngineeringIndustrial EngineeringMining EngineeringBlastingDrillingSchedulingCombinatorial OptimizationInteger ProgrammingMine SchedulingScheduling OptimizationBlasting Schedule OptimizationBottleneck ShiftingDisjunctive Graph RepresentationMine Production OptimizationMixed-integer OptimizationMixed-integer ProgrammingOpen-pit SchedulingReal-time Constraints
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit mine production operations including drilling, blasting and excavating under real-time mining constraints. The MMPT problem is formulated as a mixed integer programming model and can be optimally solved for small-size MMPT instances by IBM ILOG-CPLEX. Due to NP-hardness, an improved shifting bottleneck procedure algorithm based on the extended disjunctive graph is developed to solve large-size MMPT instances in an effective and efficient way. Extensive computational experiments are presented to validate the proposed algorithm that is able to efficiently obtain the near-optimal operational timetable of mining equipment units.
33
Introduction to algorithms [2nd ed.]
Thomas H. Cormen · 2001 · 1.9K citations
SME mining engineering handbook
Choice Reviews Online · 2011 · 815 citations