Plug‑and‑abandon operations offshore Norway are time‑consuming and costly, and thousands of wells must be permanently sealed; a key concern is whether cement can properly displace fluid when production tubing is left in the well. The study demonstrates that effective cement placement is achievable when production tubing remains in the well during plug‑and‑abandon operations. Full‑scale experiments using conventional and expandable cement were conducted, with cement quality assessed by water‑pressure tests and visual inspection of cut sections. Results show that cement is well placed in the annulus with tubing left in place, though microannuli were observed.
Abstract Well abandonment operations can be very time-consuming and costly, and thousands of wells need to be permanently plugged and abandoned offshore Norway during the upcoming years. One possible way to reduce costs during P&A operations is to leave most of the production tubing in the well, as this would save significant rig time. A major concern with such an approach is, however, whether the cement will properly displace the original fluid, due to lack of tubing centralization and possible unfavorable flow dynamics in the annulus. In this paper, we demonstrate by full-scale experimental tests that it is possible to obtain good cement placement when the tubing is left in the hole, with and without control lines. Full-scale tests have been performed with both conventional and expandable cement to determine the sealing ability of annulus cement when tubing is left in hole. The quality of the cement placement was evaluated by pressure tests with water; where leakage rates and pressure drops over the test sections were recorded, and by visual inspection after cutting the test assemblies at different places. It is seen from the experiments that cement is well placed in the annulus when tubing is left in hole, but some microannuli are detected.
10
Torbjørn Vrålstad, Ragnhild Skorpa, Nils Opedal et al. · SPE Thermal Well Integrity and Design Symposium · 2015 · 57 citations
Engineering, Geological Engineering, Petroleum Engineering +14
Novel Approach to More Effective Plug and Abandonment Cementing Techniques
Thomas Ferg, Hans-Jacob Lund, Dan Mueller et al. · 2011 · 39 citations
Engineering, Construction Management, Building Materials +14