SIMULATION STUDY OF A VEHICLE PRODUCTION LINE FOR PRODUCTIVITY IMPROVEMENT

Mohd Fadzil Faisae Ab Rashid, Nik Mohd Zuki Nik Mohamed, A. N. M. Rose, K.Y. Kor

JOURNAL OF MECHANICAL ENGINEERING AND SCIENCES · 2015 · 11 citations · 7 references

DOIFull text

Open access

Concepts

Abstract

This paper presents the study of a motorcycle frame production line in a particular company in Malaysia. Due to the high demand, the company needs to increase its production by at least 12% compared with current output. In order to improve productivity, the production-floor data was collected and simulated using the discrete event simulation approach. Later, a number of suggestions for improvement were simulated to identify the effect of the suggestions on productivity. In addition, cost analysis was also undertaken to identify the profit margin for a particular period of time for each suggestion. Simulation results indicate that there are three suggestions that are able to fulfill the 12% volume increment. In the short term, the suggestion to hire an assistant line leader will give instant effect to the profit. Meanwhile, for the medium term, Poka-yoke will give higher profit compared with the others, while in the long term, SOP (standard operating procedure) implementation will yield a better profit margin. In future, the simulation of a dynamic demand model for this product is suggested to cope with new trends in the market.

References

7