IIE Transactions · 2006 · 78 citations · 7 references
EngineeringIndustrial EngineeringOperations ManagementMaintenance EngineeringMarkov Decision ProcessesProcess SafetyHazard FunctionsMaintenance OptimizationMaintenance PolicyMaintenance StrategyPreventive MaintenanceReliability ModelingFailure ModesHazard Rate AnalysisHazard Rate ModelsMaintenance Interval DeterminationMaintenance Interval OptimizationMaintenance IntervalsMaintenance Intervals OptimizationPreventive Maintenance Optimization
Several sequential Preventive Maintenance (PM) models for predetermined PM interval policies currently exist in the literature, however, much less effort has been devoted to age-based policies. The purpose of this paper is to develop a hybrid age-based model for imperfect PM involving maintainable and non-maintainable failure modes. The proposed hybrid model incorporates adjustment factors in both the hazard rate and effective age. PM is assumed to be imperfect. It reduces the age of the system and changes its hazard rate. The system undergoes a certain number of such PM actions before replacement. The problem is to determine the number of PM actions and the length of PM intervals that minimize the total long-term expected cost per unit time. Model analysis relating to the existence and uniqueness of optimal solutions is provided. Numerical examples are presented for illustrative purposes.
7
Mathematical Theory of Reliability
A. P. Basu, Richard E. Barlow, Frank Proschan · Econometrica · 1966 · 2.7K citations
Mathematical Theory of Reliability
S. J. Amster, R. E. Barlow, Frank Proschan et al. · Technometrics · 1965 · 496 citations
H Pham · European Journal of Operational Research · 1996 · 157 citations