Statistical Analysis and Reliability Estimation of Total Productive Maintenance

M. S. Prabhuswamy, P. Nagesh, K. Ravikumar

SSRN Electronic Journal · 2013 · 12 citations · 8 references

Full text

Open access

Concepts

Abstract

productivity of plant and equipment with a modest investment in maintenance. After implementing TPM, it is necessary to measure the effectiveness of TPM. Overall Equipment Effectiveness (OEE) is an indicator that measures the effectiveness of TPM. The number of defective products produced by the machine indicates the condition of the machine and also reduces the rate of quality and affects the OEE. In this paper, an attempt is made to measure the effectiveness of TPM by performing a statistical analysis. The assessment of TPM on a continual basis is an essential activity of OEE validation. This activity involves large computations and analytical skills. The estimation of TPM is a time-consuming and costly process. It is not possible to conduct the study very often. If the behavioral pattern of TPM is determined analytically, it helps the maintenance engineer to predict the OEE over a specific period of time. In view of the above, reliability-based TPM estimation is proposed in the paper.

References

8