Production in construction is conceptualized in three complementary aspects—transformation, flow, and value generation—each requiring distinct managerial attention, with their interactions generating broader managerial tasks and necessitating consideration of contingent factors. The paper aims to present an ideal type of management for each of these aspects, grounded in the essential characteristics of construction. The authors derive these ideal management types by applying construction‑specific characteristics to each aspect. The study concludes with practical examples demonstrating the deployment of these management types, contrasting them with conventional practice that focuses only on transformations.
It has been argued that production can be conceptualize d in three complementary ways: transformation, flow and value generation. In production management, each of these aspects should be tackled. The interactions of these three kinds of managerial work provide for further generic managerial tasks. Also the contingent nature of management has to be taken into account. Based on the essential characteristics of construction, an ideal type of management of each aspect is presented. The paper ends with practical examples where the different types of management as discussed have been explicitly deployed. The managerial model outlined contrasts with the conventional managerial practice where only transformations are explicitly attended.
3