IEEE Transactions on Power Systems · 1992 · 32 citations · 10 references
BusinessIndustrial EngineeringSystems EngineeringRisk AnalysisStochastic ModelingUncertainty QuantificationLoad ForecastingMarkov ModelingHourly Load CalculationLoadOperational Risk ModelingProbabilistic Load EstimationUnit CommitmentVariation Over Time
Load uncertainty contributes to system operational risk; thus the study of system operating reserve or unit commitment risk requires a load model that includes the uncertainty in load as well as the variation with time. The authors propose a Gauss-Markov load model. This random process model includes both the time variation and the uncertainty in load. This load model is used to predict, conditional on what is known at a previous hour, the mean and the variance of the system hourly load. This mean and variance are required for a system operating reserve study and a broad spectrum of production simulations. The proposed load model is described, the model is justified, and the model is illustrated via an example.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
10
Time Series Analysis: Forecasting and Control
Beat Kleiner · Technometrics · 1977 · 2.7K citations
Computing, Data Science, Forecasting +11