IEEE Transactions on Power Delivery · 1995 · 47 citations · 2 references
EngineeringElectrical EngineeringRisk AnalysisRisk AssessmentUncertainty QuantificationElectrical SafetyInsulation SystemsProbabilistic ModelingProbabilistic Safety AssessmentReliability ModelingRisk ModelingFlashoverHigh-voltage Hazard AssessmentHigh-voltage InsulationInsulation SafetyInsulator StrengthProbabilistic Hazard AssessmentVoltage
Insulation design against insulator contamination has been made so far by using the traditional deterministic method. In this method, the maximum contamination severity is first assumed. Then, a certain margin is counted between the withstand voltage obtained from actual tests and the target operating voltage. However, both contamination severity and the withstand voltage are probabilistic variables. In the present paper, as a first step in this probabilistic approach, a risk-of-failure study of 800 kV transmission line insulation was made by treating contamination severity and degree of wetting as probabilistic variables.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
2
A comparative program on HVDC contamination tests
Yoshio Hasegawa, K. Naito, K. Arakawa et al. · IEEE Transactions on Power Delivery · 1988 · 23 citations