Journal of Construction Engineering and Management · 1997 · 58 citations · 14 references
ManagementConstruction ManagementProject ManagementConstruction EngineeringProject PlanningProject SchedulingConstruction PlanningCritical Path AnalysisSimulation MethodsConstruction Process SimulationConstruction Progress MeasurementCritical Path SchedulingDiscrete Event Simulation ModelsDiscrete-event ModelingExpected DurationProject Duration EstimationProject Schedule Management
This paper focuses on the application of “combined simulation modeling” to achieve more accurate and flexible modeling of random processes affecting construction progress. In particular, a model is presented where a project schedule prepared using the critical path method (CPM) is transferred into a process interaction-discrete event simulation model and then combined with a continuous change weather process in the same model. The combined approach provides certain advantages to other methods. It is more effective than deterministically adding the expected delay due to weather to the expected duration of the project estimated from CPM, for example. It is also more accurate than using straight Monte Carlo-simulation of the CPM schedule or discrete event simulation modeling. The paper also provides an overview of the various aspects of implementing the combined model including use of mathematical and statistical methods to model weather processes and trained neural networks to estimate the effects of weather on productivity.
14
Mathematical assessment of synthetic hydrology
N. C. Matalas · Water Resources Research · 1967 · 512 citations
An Analytical Study of the PERT Assumptions
Kenneth R. MacCrimmon, Charles Ryavec · Operations Research · 1964 · 283 citations