2005 · 10 citations · 10 references
ComputingSystems EngineeringMaintenance EngineeringQuality EngineeringSoftware EngineeringProcess ModelingReliability ModelingSoftware MaintenanceSoftware Process ModelsSoftware Quality AssuranceSoftware TestingCost Model OptimizationPoisson Process ModelsRelease Time SchedulingSoftware Failure AnalysisSoftware Release ProcessSoftware ReliabilitySoftware Reliability AssessmentSoftware Reliability Engineering
This paper deals with the problem of determining the optimum time when testing can stop and the system be considered ready for operational use. This decision, of course, depends on the model for the software failure phenomenon and the criterion used for evaluating system readiness. Using the non-homogeneous Poisson process model of Goel and Okumoto [4], two criteria are investigated, viz the software reliability and total expected cost. A simple cost model is developed and the optimum release policy, based on cost criterion, is derived. Numerical examples are used to illustrate the results.
10
Analysis of error processes in computer software
Norman F. Schneidewind · ACM SIGPLAN Notices · 1975 · 186 citations