Integrating AGV schedules in a scheduling system for a flexible manufacturing environment

Pearl Pu, John G. Hughes

2002 · 25 citations · 4 references

DOIFull text

Open access

Concepts

Abstract

In a job shop where machining time takes a comparable amount as material transportation time, it is no longer realistic to ignore the scheduling of material transportation systems such as automated guided vehicles (AGVs). The authors' algorithm discussed in this paper integrates AGV schedules into a heuristic-based scheduling algorithm to achieve the maximum amount of flexibility and optimization for a flexible manufacturing environment. Furthermore in order to allow their system to achieve different optimization goals such as shortest schedules or schedules that require the minimum computation time, the authors' system architecture consists of individual modules of heuristics so that one or any combination of these modules can be used. The authors then discuss how they control the use of these heuristic modules to achieve the best results with some experimental data.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

References

4