IEEE Transactions on Engineering Management · 2009 · 19 citations · 16 references
ManagementConstruction ManagementProject ManagementConstruction EngineeringConstruction Project ManagementDecision MakingConstruction MethodsDecision Making In ProjectsProcess ModelingProject EvaluationProject ValuationValue EngineeringConstructionConstruction Process SimulationCost Savings AnalysisCost Savings EvaluationCost-value Tradeoff AnalysisSimulation AnalysisSimulation-based AnalysisValue Engineering Decision-making
<para xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink"> Applying value engineering (VE) in a construction project has proven to be an effective way to save the cost of a project. Different VE models have been developed and used in construction projects in the past. One common attribute of construction projects is the dependence of a highly qualitative decision making process: capturing, interpreting, and quantifying expert's subjective judgment. This study proposes an advanced five-phase VE model, each phase of which consists of a series of steps to better quantify subjective opinions of VE team members. Construction simulation technique, the Cyclic Operation Network, is used as a means to minimize subjectivity in estimating the value of different alternatives in terms of time and cost savings. A case study shows that the advanced five-phase VE model improves analysis, assessment, and decision on VE. This new approach has a great potential to minimize subjectivity during VE process and improves VE decision-making process by using quantitatively derived data from the simulation analysis. </para>
16