A Pilot Survey on Causes of Delay in Malaysian Construction Project

Norngainy Mohd Tawil, Muhamad Azry Khoiry, Noraini Hamzah, Ishak Arshad, Wan Hamidon Wan Badaruzzaman

MATEC Web of Conferences · 2014 · 11 citations · 11 references

DOIFull text

Open access

Concepts

Abstract

Construction delay is a common problem in the construction industry all over the world. Many researchers seeking the causes of delay in order to reduce the probability of delay to occur. Most researcher identified causes of delay in construction to reduce the possibility of construction project to continued delay. This study is to obtain the holistic delay categories base on Drewin Open Conversion System (DOCS) for the development of a theoretical framework delay and to get the most significant causes of delay in construction industries. There are three main factor of construction delay based on DOCS; input factor, internal factor and external factor. There are130 items on causes of delay and it is divided into 31 categories. This pilot survey is distributed to students and fresh graduates that have educational background in construction. The result shown the main factor that contributes to construction delay are mistakes during construction and unrealistic project durations.

References

11