Short Circuit Modelling and Simulation of 2×25 kV High Speed Railways

L. Battistelli, Mario Pagano, Daniela Proto, Arturo Amendola, Luigi Candurro, Alfonso Pignotti

2008 · 11 citations · 5 references

Concepts

Abstract

In the paper, a detailed model for short circuit analysis of the AC 2x25 kV-50 Hz traction system has been derived and implemented. Two different methods have been used: the time domain and frequency domain approaches. The two approaches are discussed and numerical applications are reported in order to evidence the feasibility of the two procedures.

References

5