Winter Simulation Conference · 2004 · 21 citations · 4 references
ManagementIndustrial EngineeringManufacturing EngineeringManufacturing ProcessesProduction PlanningSchedulingBatch SchedulingManufacturing SimulationProduction SchedulingQueueing AnalysisQueueing TheoryScheduling TheoryDatabase-driven ArchitectureDispatching RulesLead TimeManufacturingReference ModelsScheduling With Sequence-dependent Setup TimesSequence-dependent Setup TimesSetup Times
In this paper, we consider semiconductor manufacturing processes that can be characterized by a diverse product mix, heterogeneous parallel machines, sequence-dependent setup times, a mix of different process types, i.e. single-wafer vs. batch processes, and reentrant process flows. We use dispatching rules that require the estimation of waiting times of the jobs. Based on the lead time iteration concept of Vepsalainen and Morton (1988), we obtain good waiting time estimates by using exponential smoothing techniques. We describe a database-driven architecture that allows for an efficient implementation of the suggested approach. We present results of computational experiments for reference models of semiconductor wafer fabrication facilities. The results demonstrate that the suggested approach leads to high quality solutions.
4