Flow-Assurance Modeling: Reality Check and Aspects of Transient Operations of Gas/Condensate Pipelines

L. Hagesæther, Knud Lunde, F. Nygård, H. Eidsmoen

SPE Projects Facilities & Construction · 2007 · 12 citations · 1 references

Concepts

Abstract

Summary Statoil operates a number of gas/condensate pipelines in the North Sea. This paper focuses on experience gained from operation and simulation, up to and including the tail end, of the 150-km-long, 22-in. Huldra-to-Heimdal pipeline. During initial production at Huldra, the liquid accumulation was higher than predicted by modeling. Additionally, liquid surge waves not found in simulations were observed at the receiving facility. These findings were challenging, resulting from very low-liquid surge capacity in the receiving facility, and the minimum flow rate was increased. Investigations were carried out to explain the observations, and it was determined that condensate carryover in the Huldra scrubber significantly influenced the condensate content in the pipeline. The pipeline has now entered the tail-end production phase. Because of the high liquid content at low production rates, water/monoethylene glycol (MEG) no longer reaches the receiving facility on a regular basis, causing local hydrate problems at Heimdal and a lack of MEG for reinjection. Simulations show that cyclic operation of the receiving facility will transport water/MEG out of the pipeline on a more regular basis. This change in operating philosophy was an available option that Statoil did not have to implement.

References

1