Mechanical Performance of the LARP Nb$_{3}$Sn Quadrupole Magnet LQS01

P. Ferracin, G. Ambrosio, M. Anerella, B. Bingham, R. Bossert, S. Caspi, D. W. Cheng, G. Chlachidze, H. Félice, A.R. Hafalia,

IEEE Transactions on Applied Superconductivity · 2011 · 19 citations · 9 references

DOIFull text

Open access

Concepts

Abstract

As part of the effort towards the development of Nb <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">3</sub> Sn magnets for future LHC luminosity upgrades, the LHC Accelerator Research Program (LARP) has fabricated and tested the quadrupole magnet LQS01. The magnet implements 3.4 m long Nb <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">3</sub> Sn coils contained in a support structure characterized by an external aluminum shell segmented in four sections. The room temperature pre-load of the structure is obtained by shimming load keys through bladders, pressurized during the loading operations and removed before cool-down. Temperature compensated strain gauges, mounted on structure components and coil poles, monitor the magnet's mechanical behavior during assembly, cool-down and, excitation. During the first test, LQS01 reached the target gradient of 200 T/m; the gauge data indicated that the aluminum shell was pre-tensioned to the target value estimated by numerical models, but a lack of pre-load was measured in the coil inner layer during ramping. As a result, the test was interrupted and the magnet disassembled, and inspected. A second test (LQS01b) was then carried out following a re-loading of the magnet. The paper reports on the strain gauge results of the first test and the analysis performed to identify corrective actions to improve the coil pre-stress distribution. The mechanical performance of the magnet during the second cool-down and test is then presented and discussed.

References

9