Water Resources Research · 1997 · 19 citations · 11 references
Natural ResourcesEarth SciencesHydrologyStochastic ModelingStochastic ProcessesTime Series AnalysisField Sampling DesignGroundwater ModelingHydrologic Time Series AnalysisStationarity AnalysisStochastic Systems ModelingTime Series ModelingAutoregressive ModelsGroundwater HeadGroundwater MonitoringHydrological Time Series AnalysisProbabilistic Time Series ModelingSampling Interval DesignStochastic Groundwater ModelingVariances
The problem of determining a uniform sampling time interval for monitoring serially correlated groundwater heads is the main subject discussed here. The problem is approached by stochastic time series analysis and modeling. An autoregressive integrated moving average model is assumed to fit the underlying series. Given that groundwater head data can be sampled at different time intervals and that the same stochastic model must represent the time series regardless of the sampling timescale, the parameters of the underlying model for the series sampled at a given arbitrary time interval h are obtained as a function of h and as a function of the model parameters for the series sampled at a unit time interval. This is accomplished by linking the derived variances and autocovariances at the two sampling scales. The derived equations and the sampling design procedure are tested and illustrated using the groundwater head data of Collier County, Florida.
11
Time Series Analysis: Forecasting and Control
Michael D. Geurts, George E. P. Box, Gwilym M. Jenkins · Journal of Marketing Research · 1977 · 19.3K citations
Computing, Data Science, Forecasting +11
Time Series Analysis: Forecasting and Control
Beat Kleiner · Technometrics · 1977 · 2.7K citations
Computing, Data Science, Forecasting +11
Shahrokh Rouhani · Water Resources Research · 1985 · 139 citations