IEEE Transactions on Reliability · 2009 · 77 citations · 32 references
EngineeringIndustrial EngineeringSystems EngineeringAgingMaintenance EngineeringSchedulingHazard FunctionsMaintenance ManagementMaintenance OptimizationMaintenance PolicyMaintenance SchedulingPreventive MaintenanceExpected Cost MinimizationHazard Rate AnalysisHazard Rate ModelsMaintenance IntervalsMaintenance Intervals OptimizationMaintenance Replacement SchedulingPreventive Maintenance OptimizationPreventive Maintenance Scheduling
This paper presents a generalized periodic imperfect preventive maintenance (PM) model for a system with age-dependent failure type. The imperfect PM model proposed in this study incorporates improvement factors vis-a-vis the hazard-rate function, and effective age. As failures occur, the system experiences one of the two types of failure: type-I failure (minor), and type-II failure (catastrophic). Type-I failures are rectified with minimal repair. In a PM period, the system is preventively maintained following the occurrence of a type-II failure, or at age T, whichever takes place first. At the N th PM, the system is replaced. An approach that generalizes the existing studies on the periodic PM policy is proposed. Taking age-dependent failure type into consideration, the objective consists of determining the optimal PM & replacement schedule that minimize the expected cost per unit of time, over an infinite horizon.
32
Optimum Preventive Maintenance Policies
Richard Barlow, Larry C. Hunter · Operations Research · 1960 · 1.4K citations
Engineering, Industrial Engineering, Continuous Improvement +13
Mark Brown, Frank Proschan · Journal of Applied Probability · 1983 · 552 citations
Reliable Preventive Maintenance Scheduling
Mazhar Ali Khan Malik · A I I E Transactions · 1979 · 410 citations
Engineering, Industrial Engineering, Systems Engineering +17