International Journal of Production Research · 2008 · 46 citations · 45 references
ManagementIndustrial EngineeringOperations ManagementDecision MakingOperations PlanningSchedulingJob Shop SchedulingMulti-objective SchedulingProduction Lead Time ControlProduction SchedulingShop Floor ControlWork-in-process ControlDecision RulesDispatching RulesJob Release ControlLead TimeOrder Acceptance DecisionsShop Floor DispatchingWorkloadWorkload Control
There has been extensive research on workload and input–output control with the objective of improving manufacturing operations in job-shops. In this paper, a multiple decision-making scheme is proposed to plan and control operations in a general job-shop, and to improve delivery and workload related performance measures. The job-shop characteristics reinforce the need for designing a global system that controls both the jobs entering (order acceptance, due date setting and job release) and the work-in-process (dispatching), leading to an improvement of operational measures. Previous research has concentrated on scheduling a set of orders through the shop floor, according to some decision mechanism, in order to optimise some measure of performance (usually total lead time). This means that, since only a part of the decision-making system is being optimised, the resulting decision may be sub-optimal. In this paper it is shown that the performance of the different decision rules changes when they are considered simultaneously. Hence, a higher level approach, where the four decisions (order acceptance, due date setting, job release and dispatching) are considered at the same time, should be adopted to improve job-shop operational performance.
45
S. S. Panwalkar, Wafik H. Iskander · Operations Research · 1977 · 1.3K citations
George Stalk, Thomas M. Hout · Research-Technology Management · 1990 · 1.3K citations
Simulation modelling and analysis
Information Processing & Management · 1983 · 754 citations
Business, Computational Engineering, Systems Engineering +11