A New Start-Up Demonstration Test

Amos E. Gera

IEEE Transactions on Reliability · 2010 · 29 citations · 13 references

Concepts

TL;DR

A correct choice of parameters is essential for the procedure. The study improves the CSTF start‑up demonstration test procedure to a TSCSTF procedure and evaluates its waiting time until termination. The TSCSTF procedure accepts a unit when either a total number of successful tests or a specified number of consecutive successes are observed before a total number of failures, and the waiting time until termination is evaluated. Using the new procedure may yield a shorter waiting time than the CSTF procedure by appropriately choosing the number of successes required for acceptance and the total number of failures causing rejection.

Abstract

The commonly known consecutive successes total failures (CSTF) start-up demonstration test procedure is improved to a total successes consecutive successes total failures (TSCSTF) procedure. Accordingly, a unit under test is accepted when either a total number of successful tests, or a specified number of consecutive successes of tests are observed before a total number of failures; otherwise the unit is rejected. The waiting time until termination (the length of the set of tests) of the new procedure is evaluated. A correct choice of parameters (e.g. the number of successes required for acceptance, the total number of failures causing rejection) using the new procedure may yield a shorter waiting time than that of the relevant CSTF procedure.

References

13