Journal of the Operational Research Society · 1996 · 14 citations · 4 references
ManagementIndustrial EngineeringProject ManagementProject PlanningProject SchedulingResource ManagementDecision Making In ProjectsProject Cost ManagementProject SelectionTime Horizon AnalysisTime-cost Tradeoff AnalysisProject Duration ConstraintsProject Duration MinimizationProject Trade-off AnalysisTime-resource Trade-off AnalysisTrade-off Analysis Between Duration
The paper presents an application oriented procedure for solving the project management duration/resource tradeoff problem. A procedure is presented for reducing a project from a normal to a crash duration state at a minimum amount of additional resource expenditure assuming a linear utilization functions. The procedure is network based using a graphical Cut Search Approach to locate the minimal resource level at each reduction in total project duration. Activity-on-arc networks and flow networks are utilized. The paper is presented for practical application and for conceptual development as compared to a theoretical treatment.
4
Minimal cost project networks: The cut set parallel difference method
Yue Wu, Chenglin Li · Omega · 1994 · 11 citations