Journal of Construction Engineering and Management · 2007 · 25 citations · 19 references
ManagementConstruction ManagementProject ManagementConstruction Project ManagementProject PlanningProject SchedulingConstruction PlanningDecision Making In ProjectsSchedule ControlSchedule OptimizationStochastic SchedulingConstruction Schedule OptimizationContractor SchedulingProject Duration ConstraintsProject Duration UncertaintyProject Schedule OptimizationScheduling Under Uncertainty
Much of the project scheduling literature treats task durations as deterministic. In reality, however, task durations are subject to considerable uncertainty, and that uncertainty can be influenced by the resources assigned. The purpose of this paper is to provide the means for contractors to optimally allocate their skilled workers among individual tasks for a single project. Instead of the traditional use of schedules, we develop control policies in the form of planned resource allocation to tasks that capture the uncertainty associated with task durations and the impact of resource allocation on those durations. We develop a solution procedure for the model and illustrate the ideas in an example. The data for the example is collected from a real project.
19
Simulation modeling and analysis
Journal of Manufacturing Systems · 1999 · 3.8K citations
Business, Computational Engineering, Systems Engineering +11