SPE Western Regional Meeting · 1999 · 11 citations · 2 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringWell IntegrityDrilling HydraulicsDrilling OperationsWell PlanningWellbore HydraulicsAnnular Pressure Buildup AssessmentField Data CollectionPressure Control During DrillingPressure-while-drilling HydraulicsPressure-while-drilling MeasurementsPressure-while-drilling MonitoringStuck Pipe MechanismsWellbore Pressure Profiling
Abstract Extended-reach drilling (ERD) is playing an important role in the economic development of Alaska's North Slope oil reserves. For some ERD wells, careful well planning and existing drilling practices are sufficient to avoid problems such as wellbore instability, lost circulation and stuck pipe. However, recent Alaskan experience has shown that as well step-outs increase, some operational practices developed on conventional wells are inadequate to successfully deliver cost effective ERD wells. On these wells, careful planning alone cannot always prevent costly drilling problems. The ability to analyze down hole annular pressures with pressure while drilling (PWD) data has proved invaluable to the drilling engineer. The value of this information is not fully realized, however, until it is put in the hands of the man on the rig who can act on it in real time. This paper examines the impact PWD measurements have made in recent Alaska ERD wells and focuses on both planning and operational uses. Field data are presented from problem and non-problem wells to underscore successful and unsuccessful operational practices. The importance of rig-site training in equivalent circulating density (ECD) management and linkage to drilling, circulating and tripping practices is developed.
2
Minimising Down Hole Mud Losses
Juan‐Carlos Rojas, P. A. Bern, B. L. Fitzgerald et al. · 1998 · 18 citations