1998 · 18 citations · 0 references
EngineeringCivil EngineeringOcean EngineeringGeotechnical EngineeringSubsurface Fluid FlowWater TreatmentCore AnalysisIn-situ RemediationTreatment DesignCore Flood ExperimentsFines MigrationFormation Fines MigrationPressure Build-up AnalysisStimulation Treatment EvaluationTransient Pressure AnalysisWater Depth Measurement
Abstract Ewing Bank 873 Field, developed from mid 1994 through 1995, produces from deepwater turbidite sands at an average depth of 11,000 TVD. Water depth at the platform is 775. In early 1996, pressure transient analysis of bottom hole pressure build-up surveys indicated increasing skins. Before pumping any type of remedial stimulation treatment, it was decided to test the recommended acid formulation in the lab. Acid corefloods were performed on composite samples from whole core using a typical 10% HCl/l .5% HF formulation. This acid formulation proved to be damaging as lab results indicated losses in permeability of up to 74%. A series of core floods were then performed on composite core samples to test the effects of various mud acid formulations, pre-flushes, post-flushes and acid additives. X-ray diffraction (XRD) and scanning electron microscope (SEM) analysis were also performed to help in determining the cause and mechanism of the damage. Results indicated that the loss in permeability was associated with acid additives which were causing fines migration and with silica gels precipitated as a result of the aggressive reaction of HCl with zeolite (clinoptilolite) within the formation. An optimum treatment formulation was identified, consisting of 10% Citric/1.5% HF acid, with no additives except corrosion inhibitor. This treatment was successfully applied in the field to five producing wells. Aggregate rate increased from 7400 BOPD to 16,000 BOPD and productivity index (PI) increased from 4.78 to 12.73 BOPD/psi of drawdown. P. 693