Technometrics · 1973 · 11 citations · 11 references
ManagementIndustrial EngineeringQuality ManagementManufacturing ProcessesQuality ControlQuality EngineeringAcceptance SamplingQuality Control In ManufacturingQuality Cost AnalysisQuality CostsQuality Management SystemsStatistical Process ControlAcceptance NumberAcceptance Sampling PlansExpected Cost MinimizationManufacturingQuality Control System DesignQuality Variation AnalysisSample Size EstimationSampling
This paper considers the development of a cost based industrial quality control system which functions both as an acceptance sampling plan and as a means for determining an assignable cause of quality variation in the manufacturing process. The manufacturing faci1ity studied normally produces items at a relatively constant proportion defective. The facility is subject, however, to random failures in time which cause the proportion defective to shift upwards. The objective of the paper is to develop a sampling plan which minimizes the expected total annual cost of quality control by determining t)he sample size, acceptance number, and time period between successive samples. The optimization technique employed is a combination of a multivariate search technique and a partial enumeration.
11
Minimum Cost Quality Control Tests
H. Allan Knappenberger, A. Grandage · A I I E Transactions · 1969 · 122 citations