All Days · 2000 · 31 citations · 24 references
EngineeringCivil EngineeringPetroleum EngineeringGeotechnical EngineeringReservoir EngineeringSand ControlGravel Pack DesignOpen Hole Sand ControlSand Control Completion DesignWell CompletionWell Completion DesignCompletion DesignHorizontal Well Sand Control CompletionOpen Hole Completion DesignOpen-hole CompletionOpenhole CompletionOpenhole Sand Control CompletionPore Pressure DeclineSand Control Completion
Abstract Reservoirs requiring sand control pose a major challenge for selection of a suitable completion method. Horizontal open-hole completions have been successfully utilised in such reservoirs to eliminate sand production, while maximising productivity/injectivity and well deliverability throughout the expected life of the completion and minimising risk and complexity. Although horizontal open hole sand control completions have been applied widely in the last decade, ranging from preperforated/slotted liners to gravel packs, and many case histories have been discussed in the literature, a systematic methodology for selecting these completion methods remains to be documented. It is the objective of this paper to propose such a design methodology by unifying the broad experience and understanding from a global and technically integrated perspective. The paper first discusses a generalised and unified methodology for determining when to install sand control, what to install for sand control and how to install sand control in horizontal open-hole completions. Specific factors recognised as affecting "when" are in-situ stresses and pore pressure decline (sand prediction), expected well life, production rate, hydrocarbon and well type, gross product value, sand tolerance capacity, environmental limitations and intervention capabilities, whilst the integration of all these factors have an impact on the overall risk analysis. In addition to many of the previous factors, critical drivers affecting "what" are identified as wellbore architecture, reservoir lithology and petrophysical properties, and sandface equipment reliability. Additional parameters impacting "how" are reservoir drilling fluid, displacement and cleanup methodology, screen type, operational implementation/assurance (risk management, operational timing and location logistics), torque and drag analysis, and gravel placement simulations. Secondly, examples of this methodology are presented in detailed case histories pertaining to different types of horizontal openhole sandface completions including slotted liners, standalone screens (including expandable) and gravel packs as well as various integrated cleanup methods, along with a summary of lessons learnt by each company.
24
Realistic Sand-Production Prediction: Numerical Approach
Nobuo Morita, Donald L. Whitfill, I. Massie et al. · SPE Production Engineering · 1989 · 156 citations
Engineering, Civil Engineering, Computational Engineering +17
New Criteria for Gravel and Screen Selection for Sand Control
D. L. Tiffin, Greg King, Richard Edwin Larese et al. · 1998 · 155 citations