SPE Annual Technical Conference and Exhibition · 1998 · 53 citations · 0 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringFormation EvaluationDrilling FluidsDrilling OperationsHorizontal DrillingHorizontal Well CompletionsWell CompletionWell Completion DesignCompletion Damage AnalysisCompletion Damage MitigationCompletion DesignFormation DamageHorizontal Well ProductivityHorizontal Well Sand Control CompletionLaboratory TestingOpenhole Completion
Abstract Horizontal, openhole completions, especially completions incorporating sand control, are prone to productivity impairment from a variety of sources. Often, the potential productivity of these wells is not achieved and in some cases, production is severely limited. This paper examines common sources of formation and completion damage that can lead to significant productivity impairment in horizontal, openhole completions and discusses techniques to overcome these problems. A process to design horizontal wells for maximum productivity has been applied in a variety of locations including the North Sea, Gulf of Mexico, and the Far East. First, laboratory testing of drill-in fluids (DIF), sand control screens designs, and clean-up treatments is conducted under simulated downhole conditions. These results are used in an analytical model to predict horizontal well productivity. This modeling verifies critical well design features and assists in identifying drilling/completion products and techniques that minimize productivity impairment. These studies show that a comprehensive testing, design, and evaluation protocol can be used to maximize horizontal well productivity and identify products and practices that cause productivity impairment. The modeling results and field cases illustrate the necessity of evaluating products and practices as a drilling and completion system, rather than selecting products on an individual performance basis. Also, the importance of properly designed and executed cleanup treatments to degrade/remove DIF filtercake is demonstrated. Finally, the benefit of post-auditing well performance to validate products and practices is shown. P. 399