IADC/SPE Drilling Conference and Exhibition · 2014 · 12 citations · 0 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringWell IntegrityBlowout PreventionCasing DesignDrilling OperationsWell PlanningWellbore HydraulicsCappingMetocean ConditionsOil IndustryPetroleum HydrocarbonsRig DesignWell DesignWell Path DesignWellbore Design
Abstract Relief well planning can be a critical safety measure, ensuring readiness and rapid response in the event of a catastrophic blowout that threatens human life and the environment. Recent regulatory changes in the oil industry have spurred a demand for extensive relief well planning for shelf and deepwater wells around the world. This paper discusses well planning, trajectory design, and drilling as it applies specifically to relief wells. A relief well is drilled adjacent to an existing well that has suffered an uncontrolled release of pressurized hydrocarbons. From an operational standpoint, a relief well is drilled only if surface intervention or capping attempts are taking too long or have failed to stop the flow. The goal of the relief well is to divert the pressurized hydrocarbons up a new wellbore in a controlled manner or to kill the blowout well with heavy mud and secure it with cement. For either remedy to succeed, precise interception of the existing wellbore becomes a key component in relief well design. This, in turn, makes the entire relief well planning component a very crucial and challenging aspect of the well design. This paper focuses on five phases of relief well planning: Surface location selection, including shallow hazard assessment, metocean considerations and rig logistics. Selection of drilling, evaluation, ranging and interception tools. Directional trajectory design utilizing a bottom-up approach. Project execution (drilling operations). Intercepting the well considering cased hole, openhole or the reservoir section of the blowout well. The United States Bureau of Safety and Environmental Enforcement (BSEE) requires all operators to provide documentation demonstrating their capacity to drill a relief well. Operators in the Gulf of Mexico must submit the surface location for a relief well along with their application for a permit to drill. Two locations are generally identified, and relief well paths are planned for each at every casing point prior to an interval where hydrocarbons may be encountered. As many factors can change while drilling, the planned relief well paths would require appropriate modification, but the initial plans prove feasibility and provide a basis upon which a plan to an actual wellbore could be quickly designed. The regulations ensure safe planning and execution in response to a hazardous situation, and they are in the process of being adopted by worldwide government agencies.