SIMULATION · 1996 · 20 citations · 16 references
EngineeringIndustrial EngineeringOperations ManagementInventory ManagementProduction PlanningSimulation-based DesignKanban SystemsLean ProductionManufacturing SimulationProcess ModelingPull Production SystemsSimulation ModelingAverage Handling TimeKanban SimulationManufacturing System ModelsManufacturing System SimulationMeta-modelingProduction SimulationSimulation MetamodelingSimulation Of Manufacturing Systems
In this paper, a method to determine the number of kanbans in a pull production system by using simulation metamodeling is described. The method is demonstrated on a two-card kanban- controlled manufacturing system. Through meta modeling, a relationship between the number of kanbans and the average time to fill a customer order is determined. Later this relationship is used in a model to determine the number of kanbans while minimizing costs.
16
The construction and implementation of metamodels
Robert W. Blanning · SIMULATION · 1975 · 194 citations
Patrick R. Philipoom, Loren Paul Rees, Bernard W. Taylor et al. · International Journal of Production Research · 1987 · 105 citations
Engineering, Industrial Engineering, Operations Management +14