2009 · 11 citations · 17 references
EngineeringEarth SciencesPetroleum EngineeringDrillingDrilling EngineeringWell LoggingBorehole StabilityDrilling OperationsLogging While DrillingWell Log InterpretationWellbore StabilityGeomechanical CharacterizationGeomechanical ModelingMud Weight ManagementMud Weight WindowMud Weight Window AnalysisPore PressurePore Pressure MonitoringWellbore Stability Monitoring
Abstract Many fields currently being drilled by the petroleum industry require the use of high angle, extended reach wells to access remote hydrocarbon deposits. Although pre-drill geomechanical modeling efforts are often carried out to define the mud weight window, many wells still experience significantly elevated drilling costs due to non-productive time (NPT) associated with wellbore instability. This can be attributed to many factors but is predominantly due to the lack of appropriate data while drilling. Since rock properties, stresses and pore pressure often vary from the pre-drill model predictions, critical wells frequently require real-time updating of the geomechanical models using relevant logging while drilling (LWD) data to facilitate accurate, real-time decision-making. In this paper, a case history is presented where memory-quality; high-definition LWD image logs were obtained via high-speed telemetry systems and used to assess wellbore conditions in real time. The high-resolution LWD images were used to detect faults/fractures, breakout and general hole enlargements. Relog images over known unstable sections were also obtained to ascertain the extent of time-dependent wellbore failure. These logs were successfully used to delineate the failure zones and apply the appropriate mitigating actions in real time.
17
A Step Change in Total System Approach through Wired Drillpipe Technology
Vebjørn Nygaard, M. M. R. Jahangir, Trond Gravem et al. · 2008 · 30 citations