SPE Middle East Oil and Gas Show and Conference · 2007 · 16 citations · 23 references
EngineeringPetroleum EngineeringProduction EngineeringUnconventional ReservoirsWell IntegrityAcid FracturingProduction EnhancementTreatment DesignCorrosion ProductsFormation DamageFormation Damage RemediationHydrogen Sulfide CorrosionHydrogen Sulfide RemovalWorkover Planning
Abstract Saudi Arabia has embarked on developing its gas fields. Some of these fields produce sour gases with hydrogen sulfide content that can reach 10 mol% and carbon dioxide of 4-5 mol%. The carbonate formation is very tight and acid fracturing treatments were used to enhance the productivity of these wells. All tubulars were pickled before the acid fracturing treatments. Pickling was needed to remove mill scale (iron oxides) and pipe dope. Invasion of these contaminants into the formation would cause severe formation damage, which might adversely affect the productivity of these wells. Some of the gas wells have been on production for several years. There was a need to stimulate these wells to perform various workover operations. The question raised was whether there was a need to pickle the tubulars before performing acid treatments to these relatively old wells given the fact that these wells were pickled when the lower zone of the formation was fractured for the first time several years ago. Unlike new wells, the tubulars of old wells are typically covered with various corrosion products, condensate, and pipe dope. To address the question of pickling of old well tubulars, an acid formulation was designed to remove various contaminants that might present in the wellbore, while maintaining the integrity of the tubulars. The acid treatment was bullheaded in seven wells. Wellhead samples were collected every two minutes during the well flow back and analyzed for key elements. Similar to new tubulars, field data indicated that there is an absolute need to pickle old tubulars. High concentrations of total iron were detected in the well flow back samples. Manganese concentration was relatively low, indicating the acid pickling treatment did not affect the integrity of the low-carbon steel tubing. This paper describes in detail the laboratory work, treatment design, and field application. It will give conclusive evidence on the importance of pickling old tubulars and highlight the need for such treatments.
23