The Relationship of Thickening Time. Gel Strength, and Compressive Strength of Oilwell Cements

Fred Sabins, David L. Sutton

SPE Production Engineering · 1986 · 47 citations · 3 references

Concepts

Abstract

Summary A previous investigation1 of the effect of thickening times on early compressive-strength and gel-strength development has been expanded to include a wider range of well conditions, a greater variety of slurry types, and a more thorough evaluation of static gel strength. No positive relationship between thickening time and the onset or the rate of static-gel-strength development could be found. With few exceptions, all slurries tested developed values greater than 48 Pa [100 lbf/100 sq ft] gel strength in less than 20 minutes. Data presented show that times needed to develop a specific static gel strength are more closely related to the type of slurry than to thickening time. A calculation method is given for estimating shutdown factor from static-gel-strength data. New data confirm that 12- and 24-hour compressive strengths are not significantly reduced by reasonable increases in thickening time. The maximum single-stage cement interval without an unreasonable waiting-on-cement (WOC) time for specified compressive strength has been redefined in terms of interval temperature differences.

References

3