Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem

Chung‐Yee Lee, T.C.E. Cheng, Bertrand M.T. Lin

Management Science · 1993 · 294 citations · 16 references

Concepts

TL;DR

The study aims to minimize makespan in a 3‑machine assembly‑type flowshop scheduling problem. The authors analyze polynomially solvable cases, propose a branch‑and‑bound scheme, and develop three heuristics with provable error‑bound analysis for the general problem. The general problem is strongly NP‑complete, and the proposed heuristics exhibit bounded error.

Abstract

This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.

References

16