Publication | Closed Access
Flowshop and Jobshop Schedules: Complexity and Approximation
426
Citations
5
References
1978
Year
Job SchedulerFlow ShopsEngineeringScheduling AnalysisIndustrial EngineeringScheduling ProblemProduction SchedulingSystems EngineeringLogisticsComputational ComplexityJobshop SchedulesComputer ScienceScheduling (Production Processes)Minimum Finish TimeNon-preemptive SchedulesCombinatorial OptimizationOperations Research
We show that finding minimum finish time preemptive and non-preemptive schedules for flow shops and job shops is NP-complete. Bounds on the performance of various heuristics to generate reasonably good schedules are also obtained.
| Year | Citations | |
|---|---|---|
Page 1
Page 1