International Journal of Production Research · 1995 · 59 citations · 15 references
ManagementOperations ManagementForecastingProduction PlanningTime Series AnalysisForecast Error AnalysisJob Shop SchedulingProduction ForecastingTime Series ForecastingTime Series PredictionDelivery ForecastingDelivery Performance EvaluationDelivery Performance MeasurementDelivery Time PredictionDynamic Forecasting ModelsForecasting For OperationsLead Time Prediction
This paper presents a forecasting approach to flowtime prediction in a job shop. The flowtime prediction relationship developed considers both job characteristic and shop loading information. Forecast errors are shown to be approximately normally distributed. A lateness feedback approach is also developed to dynamically estimate the variance of forecast error. The estimated distribution of forecast error is used to set delivery safety allowances which are based on a desired level of delivery performance. Results show that the lead times required to maintain a desired level of delivery performance are lowest when due-date dependent dispatch is used.
15
A Proof for the Queuing Formula: <i>L</i> = λ<i>W</i>
John D. C. Little · Operations Research · 1961 · 2.7K citations
Deborah A. Davis, C. Dennis Pegden · 1988 · 296 citations · Full text
Engineering, Manufacturing Engineering, Systems Engineering +12
A Simulation Study of Predictable Due-Dates
James K. Weeks · Management Science · 1979 · 217 citations
Management, Manufacturing Engineering, Operations Management +17