International Journal of Production Research · 1976 · 239 citations · 5 references
ManagementIndustrial EngineeringOperations ManagementProduction PlanningQueuing TheorySchedulingJob Shop SchedulingMachine SchedulingProduction SchedulingScheduling TheoryDue Date ControlDue DatesDue-date Based SchedulingDue-date DeterminationJob Shop Due-date SchedulingJob Shop SimulationScheduling With Due Dates
Abstract Much of job-shop scheduling research is based on the assumption that due dates are outside the control of the scheduler. The paper examines several procedures for specifying due dates, largely dependent on the expected processing time for jobs and on the level of congestion in the shop. The effect of these procedures is examined in the case of three loading rules (FIFO, St and SI∗) On waiting times, on missing due dates and on notional cost functions. The study is based on numerous simulations of a given shop operating at various levels of load ratio and the case of a fluctuating load is briefly examined.
5
Simulation of a Simplified Job Shop
Christopher Baker, B. P. Dzielinski · Management Science · 1960 · 116 citations
Management, Industrial Engineering, Operations Management +17
A GASP simulation study of job-shop scheduling
Said Ashour, S.D. Vaswani · SIMULATION · 1972 · 25 citations