Concepedia

Abstract

Abstract The Anton Irish field was discovered in 1945, unitized in 1950 for a produced gas pressure maintenance project and converted to a waterflood in 1969. In 1997 CO2 flooding began and currently accounts for about 85% of the unit production. Presently, the entire field produces around 6,500 BOPD; 36.5 MMCFPD of recycled CO2, and 69,200 BWPD. Over the years of flooding, various conformance problems have been identified and many attempts have been made to address these problems with limited to no success. In 2003 a new program was initiated to re-evaluate the problems and design better solutions. This paper will outline the diagnostic efforts that were undertaken, discuss the basic findings of that effort, review the resulting solutions that were designed to resolve these problems, and show the results of this work.