Scheduling batches with simultaneous job processing for two-machine shop problems

Chris N. Potts, Vitaly A. Strusevich, Thomas Tautenhahn

Journal of Scheduling · 2001 · 49 citations · 18 references

Abstract

We consider the problem of scheduling independent jobs on two machines in an open shop, a job shop and a flow shop environment. Both machines are batching machines, which means that several operations can be combined into a batch and processed simultaneously on a machine. The batch processing time is the maximum processing time of operations in the batch, and all operations in a batch complete at the same time. Such a situation may occur, for instance, during the final testing stage of circuit board manufacturing, where burn-in operations are performed in ovens. We consider cases in which there is no restriction on the size of a batch on a machine, and in which a machine can process only a bounded number of operations in one batch. For most of the possible combinations of restrictions, we establish the complexity status of the problem. Copyright © 2001 John Wiley & Sons, Ltd.

References

18