Concepedia

Publication | Closed Access

Scheduling batches with simultaneous job processing for two-machine shop problems

49

Citations

18

References

2001

Year

Abstract

We consider the problem of scheduling independent jobs on two machines in an open shop, a job shop and a flow shop environment. Both machines are batching machines, which means that several operations can be combined into a batch and processed simultaneously on a machine. The batch processing time is the maximum processing time of operations in the batch, and all operations in a batch complete at the same time. Such a situation may occur, for instance, during the final testing stage of circuit board manufacturing, where burn-in operations are performed in ovens. We consider cases in which there is no restriction on the size of a batch on a machine, and in which a machine can process only a bounded number of operations in one batch. For most of the possible combinations of restrictions, we establish the complexity status of the problem. Copyright © 2001 John Wiley & Sons, Ltd.

References

YearCitations

1976

662

1992

462

1978

426

1998

376

1995

352

1995

216

1992

210

1993

202

1956

186

1990

144

Page 1