2001 · 22 citations · 7 references
EngineeringCivil EngineeringPetroleum EngineeringBuilding MaterialsDrilling EngineeringGeotechnical EngineeringCementing OperationsCementitious MaterialsHole CleaningWellbore CleaningWellbore StabilityZonal IsolationCementingCementing TechnologyFoamed Cement SystemsFoamed CementingLinersWellbore CementingZonal Isolation AssessmentZonal Isolation Evaluation
Abstract This paper describes the reasons for and execution of four foamed cement jobs to provide zonal isolation for a 4 ½-in. horizontal liner. Foamed cement was selected as the most effective means to help achieve all of the following objectives: High mud displacement in a small annulus Hole cleaning on the low side of the hole No free water or gas channel development Low slurry fluid loss Containment of stimulation treatment in selected porosity streaks Prevention of cement sheath cracking The benefits of foamed cement vs. non-nitrified cement as they relate to the above objectives are explained in the body of the paper. From the analysis, foamed cement can be a far superior and effective means of providing long-term zonal isolation when compared to conventional, non-nitrified cements. The paper also outlines steps taken to execute the foamed cementing operation on horizontal liners of four Wyoming wells. Included are best practices for pre-job analysis and planning, job execution, and post-job evaluation.
7