Optimization of Well Placement Under Time-Dependent Uncertainty

Umut Özdogan, Roland N. Horne

SPE Reservoir Evaluation & Engineering · 2006 · 84 citations · 7 references

Concepts

TL;DR

Early well‑placement decisions can improve later placements by increasing certainty, and efficient use of information can add value beyond oil recovered; the pseudohistory defines the probable future reservoir response from probabilistic forecasting. The study proposes an approach that uses time‑dependent information to reduce uncertainty and increase probable NPV. The approach couples well‑placement optimization with recursive probabilistic history‑matching using the pseudohistory concept, and is tested on a reservoir with multiple realizations matching the same production history. Incorporating probabilistic production profiles from drilled wells into the optimization scheme improves subsequent well‑placement decisions.

Abstract

Summary Well-placement decisions made during the early stages of exploration and development activities have the capability to improve later placement decisions by providing more information (greater certainty). Therefore, recovery and efficient use of information may add value beyond the amount of oil recovered. This study proposes an approach that emphasizes the value of time-dependent information to achieve better decisions in terms of reduced uncertainty and increased probable net present value (NPV). Unlike previous approaches, well-placement optimization is coupled with recursive probabilistic history-matching steps through the use of the pseudohistory concept. The pseudohistory is defined as the probable (future) response of the reservoir that is generated by a probabilistic forecasting model. To test the results of the proposed approach, an example reservoir was investigated with multiple realizations, all of which match the same production history. The results of this study showed that subsequent well-placement decisions can be improved when probabilistic production profiles obtained from the wells, as they are drilled, are incorporated in the optimization scheme.

References

7