Management and Production Engineering Review · 2014 · 23 citations · 8 references
ManagementIndustrial EngineeringOperations ManagementInventory ControlInventory ManagementProduction PlanningDemand ManagementInventory TheoryLot SizingCapacity UtilizationHeijunkaLevelingLot Sizing Under Demand UncertaintyManufacturing System ModelsProduction Lot SizingProduction Planning Lot SizingStochastic Lot Sizing
Abstract Here we discuss a multi-product lot-sizing problem for a job shop controlled with a heijunka box. Demand is considered as a random variable with constant variation which must be absorbed somehow by the manufacturing system, either by increased inventory or by flexibility in the production. When a heijunka concept (production leveling) is used, fluctuations in customer orders are not transferred directly to the manufacturing system allowing for a smoother production and better production capacity utilization. The problem rather is to determine a tradeoff between the variability in the production line capacity requirement and the inventory level.
8