IEEE Transactions on Power Delivery · 2014 · 25 citations · 3 references
EngineeringElectrical EngineeringEnergy SystemsHeat TransferThermal AnalysisCold Start PerformanceTransient Flow AnalysisCold Start ModelingCold Start TestingComputational Fluid Dynamics ValidationTransformer DesignTransformer InsulationTransformer Models
A 240-MVA, 165-GRDY/20-kV generator step-up transformer was insulated with Envirotemp FR3 fluid. The transformer was energized during a cold temperature period in mid-December 2010. This is believed to be the largest generator step-up transformer filled with a natural ester fluid that was energized at low temperatures. The lack of cold start experience of natural ester-filled power transformers created questions and at least some uncertainty as to the outcome. This paper describes the instrumentation used and data collected during the cold startup procedure. In addition, a computational fluid dynamics analysis of this transformer design was performed that provided calculated temperatures and elapsed times until steady-state temperatures were achieved. Comparisons were made between the actual and calculated values. The results indicate that the cold startup procedures for a power transformer are the same whether filled with mineral oil or natural ester fluid of similar characteristics as used for this paper.
3
Behavior of ester dielectric fluids near the pour point
Kevin Rapp, G.A. Gauger, J. Luksich · 2003 · 24 citations
SUSTAINABLE ELECTRICAL ENERGY USING NATURAL ESTER TECHNOLOGY
David Bingenheimer, Luiz Franchini, Eugene Del Fiacco et al. · 2011 · 17 citations
Engineering, Electrical Engineering, Materials Engineering +17