International Journal of Production Research · 2009 · 15 citations · 19 references
EngineeringIndustrial EngineeringManufacturing EngineeringProduction EngineeringProduction PlanningProduction SystemsConstraint ManagementProduction Lead Time ControlProduction Planning SystemsProduction SchedulingShop Floor ControlWork-in-process ControlConstrained Production PlanningDiesel EnginesDrum-buffer-ropeFeedback Control In Production SystemsLead Time ConstraintsProduction Control SystemsProduction Lead TimeProduction System Design
Abstract\n The article presents the results of research on creating a dedicated planning system and shop floor control in the conditions of make-to-order in manufacturing complex products. The research was done in Marine Diesel Engines Factory, HCP S.A. Poznan conditions. HCP S.A. Poznan is the biggest producer of high-power marine engines in Europe. The results of the research is working out a method for buffering critical resources shop floor control. These methods of buffering critical resources include procedures of buffers management, (buffers configuration and optimization), a system of disruptions compensation and feedback protecting from destructive influence of ?wandering bottlenecks.? The flow simulations show that this method is more effective than classical drum-buffer-rope production solution, according to TOC, using FIFO rule. Finally, the lead-time and the level of work-in-process were about 20% lower than the solution recommended to TOC. In the last part of the article a place and a method of implementing the solution in a planning system of an enterprise are discussed.
19
An analysis of the supplier selection process
Rohit Verma, Madeleine Pullman · Omega · 1998 · 594 citations
Management, Operations Management, Supply Chain Management +12
The Role of Inventory in Delivery-Time Competition
Lode Li · Management Science · 1992 · 214 citations